• Home
  • About Us
    • Our Process
    • Our Portfolio
    • FAQS
  • Engineered Stone
    • Cambria
    • Caesarstone
    • Silestone
    • Dekton
  • Cambria Premier Dealer
  • Natural Stone
    • The Stone Collection
    • Arizona Tile
    • AracruzRE
    • MSI
  • Specials
  • Tile
    • Emser
    • MSI
    • Arizona Tile
  • Cabinets
    • Option 1
    • Option 2
  • Flooring
    • Republic Floor
    • Emser
    • MSI
    • Contact Us
  • More
    • Home
    • About Us
      • Our Process
      • Our Portfolio
      • FAQS
    • Engineered Stone
      • Cambria
      • Caesarstone
      • Silestone
      • Dekton
    • Cambria Premier Dealer
    • Natural Stone
      • The Stone Collection
      • Arizona Tile
      • AracruzRE
      • MSI
    • Specials
    • Tile
      • Emser
      • MSI
      • Arizona Tile
    • Cabinets
      • Option 1
      • Option 2
    • Flooring
      • Republic Floor
      • Emser
      • MSI
      • Contact Us
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
    • Our Process
    • Our Portfolio
    • FAQS
  • Engineered Stone
    • Cambria
    • Caesarstone
    • Silestone
    • Dekton
  • Cambria Premier Dealer
  • Natural Stone
    • The Stone Collection
    • Arizona Tile
    • AracruzRE
    • MSI
  • Specials
  • Tile
    • Emser
    • MSI
    • Arizona Tile
  • Cabinets
    • Option 1
    • Option 2
  • Flooring
    • Republic Floor
    • Emser
    • MSI
    • Contact Us

Account


  • Bookings
  • My Account
  • Sign out


  • Sign In
  • Bookings
  • My Account
ABR Surfaces

Reputable Products. World Class Showroom and Fabrication Facility. Proven processes. Integrity.

The Process

Step 1: Design Consultation & Estimate

Step 1: Design Consultation & Estimate

Step 1: Design Consultation & Estimate

When ready, schedule a visit or drop by our showroom to review your project. When you arrive a member of our team will review your prospective project and guide you to the perfect material that best fits your design and budget needs. Our team will then provide a take off estimate based on your cabinet drawings or rough sketch dimensions. 

When ready, schedule a visit or drop by our showroom to review your project. When you arrive a member of our team will review your prospective project and guide you to the perfect material that best fits your design and budget needs. Our team will then provide a take off estimate based on your cabinet drawings or rough sketch dimensions. If necessary we will schedule an in-home consultation to provide a thorough estimate.

Learn more
Template

Step 2: Template

Step 1: Design Consultation & Estimate

Step 1: Design Consultation & Estimate

After we've collected a deposit on the estimate we will place the order for the materials and schedule a time to meet at your space to digitally template the area receiving new surfaces. The templating process will take approximately 1-2 hours (or more depending on scope of project). 

Prior to the Scheduled Template: 

1. All cabinets must b

After we've collected a deposit on the estimate we will place the order for the materials and schedule a time to meet at your space to digitally template the area receiving new surfaces. The templating process will take approximately 1-2 hours (or more depending on scope of project). 

Prior to the Scheduled Template: 

1. All cabinets must be completely installed and level. Incomplete or improper installation may include (but is not limited to the following): 

  • Un-level cabinets. Cabinets must be level to properly support the stone. 
  • Cabinets not secured in permanent location. Moving of cabinets after template can result in a poor fit. 
  • Upper cabinets to sit on countertops must be installed after countertops are in place. 


2. Old counters to remain in place. Our laser measuring technology allows you to leave your surfaces in until the week of install. Removal of tops to be done prior to install (Demo available upon request).


3. Sink must be on site at time of template so we can verify

 measurements and take manufacturers template back to shop for reference during fabrication. 

AT TEMPLATE APPOINTMENT:

The person responsible for the decision-making must be present for the scheduled template appointment. As we will be discussing important project details such as seam locations, edge details, overhangs, and radius (if applicable). Once the template is completed the decision maker will be obligated to sign off on the completed template.  

Learn more

Step 3: Layout

Step 1: Design Consultation & Estimate

Step 4: Fabrication

Once materials have been received to our facility you are welcome to join us in the layout process where we overlay a digital template on a high resolution photo of the material to maximize yield and flow of material, as well as capture your favorite details within the materials selected. 

Learn more

Step 4: Fabrication

Make Your Dream Countertops a Reality!

Step 4: Fabrication

The fabrication process will take a minimum of 5-10 business days depending on the size and complexity of the project, as well as additional jobs in production. 

Our experienced fabrication artisans seek to maximize material yield with precise and efficient cuts on each slab of material. Fabrication includes creating and polishing edge pro

The fabrication process will take a minimum of 5-10 business days depending on the size and complexity of the project, as well as additional jobs in production. 

Our experienced fabrication artisans seek to maximize material yield with precise and efficient cuts on each slab of material. Fabrication includes creating and polishing edge profiles on the stone as well as creating sink and cooktop openings if applicable. 

Learn more

Step 5: Installation

Make Your Dream Countertops a Reality!

Make Your Dream Countertops a Reality!

We will contact you at least 2-3 days prior to job completion to arrange for a date and time for the installation process. Installation will normally take a few hours, but there are some large jobs that take longer to finish and may be subject to a multiple-day installation. 

On your scheduled install date, please have all areas receiving 

We will contact you at least 2-3 days prior to job completion to arrange for a date and time for the installation process. Installation will normally take a few hours, but there are some large jobs that take longer to finish and may be subject to a multiple-day installation. 

On your scheduled install date, please have all areas receiving stone clear and accessible. The sink, faucet, and stove top must be disconnected and removed prior to the installation of the new stone countertops. ABR Surfaces is not responsible for removing your stove, sink, or upper cabinets that may interfere with installation. Please note, these issues will be addressed if applicable at the time of template on a job by job basis as necessary. Additionally, we will be happy to discuss the specifics of your job site at any time prior to installation.

Our installation staff will be courteous, professional, and knowledgeable during the whole process. They will clean up after themselves and will be careful not to cause any type of damage or mess on the job site. After the installation is completed, they will clean up and leave the job-site in the same condition as they found it. 

Learn more

Make Your Dream Countertops a Reality!

Make Your Dream Countertops a Reality!

Make Your Dream Countertops a Reality!

Click below to start the process. 

Learn more

Get a Free Quote

Contact Us For a Free No Obligation Quote.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Visit our showroom!

Our 3,300+ Sq. Ft. facility is bound to have an example of the perfect quartz, natural stone or tile for your surface project. Including 45 full slabs of material on display. 

Xact Stone Gallery

400 South Clark Drive, Tempe, Arizona 85281, United States

(480)948-3132

Hours

Monday-Friday: 9AM - 5PM. 

Saturday & Sunday: By Appointment

  • Home
  • Our Process
  • Our Portfolio
  • FAQS
  • Cambria Premier Dealer
  • Specials
  • Contact Us

Xact Stone Gallery

400 South Clark Drive Suite 105, Tempe, Arizona 85281, United States

(480) 948-3132

Copyright © 2024 Xact Stone Gallery - All Rights Reserved.

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept

Tell us About Your Project!

Learn more